Tender Date And Time Technical Descriptions

«Supply of Automatic Step Voltage Regulator For Medium voltage Distribution Networks».

PARTICIPANTS IN THE CONSULTATION MAY SEND THEIR OBSERVATIONS AND COMMENTS UNTIL: 1:00 p.m. 10.01.2023 AT THE GRID OPERATIONS DEPARTMENT:

BY POST:

HEDNO, Grid Operations Department,

24 Sygrou Ave, 117 42 Athens

Attention of: Mr. G. ANDREAKOS,

Director of Grid Operations Department

OR

BY EMAIL TO THE E-MAILS BELOW:

G.Andreakos@deddie.gr

I.Alexandri@deddie.gr

T.Thanos@deddie.gr

 

 

 

TECHNICAL DESCRIPTION HEDNO DED-274«  AUTOMATIC STEP VOLTAGE REGULATOR FOR MEDIUM VOLTAGE DISTRIBUTION NETWORKS»