HEDNO SA as (NII)

Regulatory Framework governing the responsibilities of HEDNO SA as Non-Interconnected Islands Operator (NII)

Non-Interconnected Islands (NIIs) are the islands of Greece whose Electricity Distribution Network is not connected to the Transmission System or the Distribution Network of the Mainland.

The management of the Electricity Systems of the Non-Interconnected Islands, which includes the management of the production, market operation and the systems of these islands, is the responsibility of HEDNO S.A. and is carried out in accordance with the “Non-Interconnected Islands Electrical System Management Code”, provided for in Article 130 of Law 4001/2011, as in force.

For the implementation of the NII Electrical Systems Management Code, RAE approved with Decision 389/2015 the “Infrastructure Implementation Action Plan in accordance with Decision 2014/536/ΕΚ/14.08.2014 of the European Commission”.

The regulatory framework is also governed by other texts issued by the Regulatory Authority for Energy concerning the average variable cost of conventional production units in the NIIs, Utilities in the NIIs, Prices of hybrid power stations in the NIIs, etc