3.
Pilot Projects
Hybrid Energy Project of Ai Stratis (Ai Stratis Green Island)
The “Ai Stratis – Green Island” project is an innovative step toward sustainable development, combining hybrid energy sources with a teleheating system. It aims at significantly reducing the island’s energy footprint by covering the majority of its energy needs through Renewable Energy Sources (RES).
Year of operation • 2024
- HS Power: 1 MW
- Coverage target: At least 85% of annual energy demand
Main systems:
Wind turbine (900 kW)
Photovoltaic park (226.8 kW)
Energy storage system (1280 kW, 2560 kWh)
Teleheating system (3×335 kWel)