Our News
Our last news
03.04.24
- Νon-Interconnected Islands
Announcement by HEDNO, as the Non-Interconnected Islands (NII) Operator, on the billing of RES stations operating at NIIs (February 2024)
04.03.24
- Νon-Interconnected Islands
Announcement by HEDNO, as the Non-Interconnected Islands (NII) Operator, on the billing of RES stations operating at NIIs (January 2024)
04.03.24
- Production information sheets
Issuance of Power Generation Informative Report for the non Interconnected Islands October – November – December 2023
29.01.24
- Νon-Interconnected Islands