Our News
Our last news
04.03.24
- Νon-Interconnected Islands
Announcement by HEDNO, as the Non-Interconnected Islands (NII) Operator, on the billing of RES stations operating at NIIs (January 2024)
04.03.24
- Production information sheets
Issuance of Power Generation Informative Report for the non Interconnected Islands October – November – December 2023
29.01.24
- Νon-Interconnected Islands
Announcement by HEDNO, as the Non-Interconnected Islands (NII) Operator, on the billing of RES stations operating at NIIs (December 2023)
07.12.23
- Announcements
Announcement 1st amendment of the Joint Ministerial Decision “PVs in Roof”
02.11.23
- Νon-Interconnected Islands