Average interruption duration per customer (SAIDI)
Strategic Transformation and Digitisation
The strategic projects included in our new strategic plan mark the course of the HEDNO in the near future.
Strategy, Modernisation & Innovation
We aim to be a modern network management company through digitised operations, modernisation of our systems and new planning and development tools.
Growth and modernisation through the Strategic Projects
In our new business plan, we include Strategic Projects, which are both a central axis and a catalyst for the modernization of our company, while marking our path for the near future.
These projects are part of the Transformation Programme of the BPA towards a modern Network Management Company through digitised operations and new tools for planning and deployment of the Distribution Network across the mainland and the Non-Interconnected Islands.
Greece in the new era of Smart Grids
Our strategic projects create the basic conditions for Greece to enter the new era of Smart Grids, on the basis of which new markets for services and products can be developed in a constantly changing electricity market. The electricity sector has entered a period of radical change internationally, both technologically and in terms of business, and we at HEDNO are seeking to develop the necessary infrastructure with the maximum possible benefit for the economy, society and the environment.
The Strategic Projects cover a wide range of modernization activities, such as Smart Grids, Telemetering of consumption, Tele-customer service and automation in many internal operations, always keeping an eye on new trends in the electricity sector.
Benefits of the projects
The benefits expected from the implementation of the Strategic Projects, in combination with the company’s fixed objectives, are:
improving the quality of energy and services provided to customers, while reducing the company's operating costs
improving working conditions for its staff
the more efficient operation of the electricity market
the protection of the environment by increasing the penetration of Renewable Energy Sources (RES)
Transformation and digitisation projects
Modernisation of the Distribution Network Control Centre (DNCC)
Establishment of an Island Network Control Centre
Modernisation of Network Control in the rest of the country
Upgrading of Regional Remote Control Equipment in Networks
Geographic Information System (GIS) installation
New Customer Service Information System
Installation of Tele-service Systems for Customers
Network Development Planning Upgrade
Development of ITS Infrastructures in Implementation of the ITS Code
Development of Smart Islands - Pilot Project and its Extension
Customer Telemetry
Supply Chain Reorganisation
Information Management System
Key figures of the electricity distribution network
Network length
OF WHICH
In total
Substations
In total
Renewable Energy Sources
In total
Clients and Consumption
In total
In total
Quality of the services provided
At HEDNO we aim at providing better quality services to our Customers and we are committed to you mainly in two ways:
- the Ministerial Decision of 2007 (Δ5/ΗΛ/Β/Φ1.10/6636/26.03.2007) which defines the time of response to Customers’ requests for power supply.
- Under the “Guaranteed Services” program that has been in effect from 1/4/2014 (approved by RAE).
At the same time, two main indicators are monitored to determine the quality of the provided energy:
Average frequency interruptions per customer (SAIFI)
Aiming at further improvement of the service quality indexes (duration for power supply studies and constructions) and energy quality indexes (decrease of the number of failures, minimization of restoration time, improvement of the provided voltage, etc.) along with the reduction of the operating cost and the increase of productivity, we proceed to important investments in networks relative to:
- Increase of network sufficiency for the coverage of the demand.
- Ensure further enhancement of the Network reliability
- Network development and work automation
Modernization
Modernisation of metering systems
- Telemetry of Medium Voltage Customers
- Telemetry of Large Low Voltage Customers with agreed power above 55KVA
- Metering data security and data protection
Systems for the supervision, management and remote control of the Distribution Network
- New SCADA systems
- Remote Controlled Switches
- Substation control units MT/XT
- Fault Indicators
Pilot projects of Xanthi area
- Extension of Geographical Information System
- Upgrading of the peripheral equipment of the remote controls in the networks
- Pilot projects in the Xanthi Region related to the Strategic Projects
- Pilot projects in the Xanthi Region "Testing of new technologies"
Development of a Unified Information Management System
- Data driven culture
- Data Science
- Machine Learning
- Paperless working environment
- Process Register